Scope of works
The project centred on the inspection, removal and replacement of the waterproofing system on a live treated water service reservoir. Ensuring the tank remained fully operational throughout was critical, requiring tightly controlled work sequencing and strict contamination prevention measures.
Existing conditions
The reservoir roof was originally protected by a loose‑lay membrane. Beneath this, the team identified:
• Teram geotextile layer
• 50mm Kingspan insulation
• A Proofex-type waterproofing membrane
• Primer layer over the concrete slab