Welcome to Mackenzie Construction.com
05 September 2010
  | Email | Home  |  Text Version
  Our Company  
 
  • Directors
  • Contact Us
  • Background
  •  

      Business Sectors  
     
      Civil Engineering
      Refurbishment
      Structural Repairs
      Minor Works
      Specialist Concrete Repairs
      Customers
      Civil Engineering Projects
  • Bellshill Town Centre Streetscape Phase 1 & 2
  • Barony 'A' Frame
  • Friars Street Environmental Improvements Phase 1
  • Deerdykes Composting Facility
  • Wallacewell Flood Aleviation Project
  • Cannongate & Lawnmarket Quality Streetscape.
  • A8011 Seafar Road and Bridgeworks
  • M8 Whitecart Viaduct
  • BP Terminal, Inverness
  • Sensory Gardens, Beild Housing Association
  • Crown Circus Gardens
  • Bo'ness Harbour Re-Opening Works.
  • Anchor Mills
  • Castlegreen to Ardoch Pumping Scheme
  • Glenburn Bridge
  • Yorkhill Hosital NHS Trust - Car Park
  • Easter Inch Infrastructure Project
  •   Structural Repair Projects
      Refurbishment Projects
      Partnerships and Frameworks
     

      Publications  
     
  • Newsletters
  • Health and Safety
  • Environmental
  • Equal Opportunities
  • Quality Policy
  •  

     
     
      Wallacewell Flood Aleviation Project  
     

    Our Design and Build contract in the vicinity of Wallacewell Road, Robroyston, Glasgow, with a value of £3.7M, commenced in September 2005 with an anticipated duration of 53 weeks.

    This is in connection with generating increased capacity within the existing drainage network, and has also been designed to alleviate internal flooding from 16 properties in the Northgate/Ferness Road area.  Scottish Water are paying a contribution to the project to cover the costs of the flood alleviation.

     

     

     

    The increased capacity is generated via upsizing existing sewer lines and the construction of 3No in-situ reinforced concrete tanks. Ground conditions create the largest challenge on the project, and vary from whinstone through to sands and clay and at the location of 1No storage tank the presence of peat and possible mine workings.  The works are being carried out for the Robroyston Technical Group with Scottish Water Solutions managing the project on their behalf.

    All the works were carried out in line with Considerate Contractors Scheme and the impact of the works to residents was considered throughout the project.

    Due to the location of  the works a lane closure was necessary for part of the construction period and suitable traffic management was put in place. Street work notifications were made to Scottish Water and Glasgow City Council.

     

     
      Customer Info  
     
  • Register
  • Login
  •  
     

      Accreditations  
     
  • Health & Safety Management System
  • Quality Management System
  • Investors In People
  • RoSPA Gold Award
  • Considerate Contractor
  • Safe Contractor
  • UVDB Verify
  • CHAS
  •  

      News  
     
     
     

      The Scotsman - News  
     
    Top Tory Andy Coulson cited for Tommy Sheridan perjury hearing

    Angry council staff move to strike over pay-freeze diktat

    Let there be light in Waverley


    thescotsman.scotsman.com