Mackenzie Construction structural Repair
operatives have extensive experience in a variety of projects. We carried out
works to Cluanie and Loyne Dams for Scottish Hydro Electric Plc. Works consisted
of concrete repairs, joint sealing and pressure grouting to precast concrete
panels on vertical faces of both Dams.

As access was
limited due to the water levels all operations were being carried out from
mobile suspended access cradels as shown in the picture opposite.